⚠ CONCEPT DEMONSTRATION — ALL DATA IS SYNTHETIC AND ILLUSTRATIVE. NOT REPRESENTATIVE OF ANY REAL SYSTEM OR CUSTOMER. ⚠
Phase 2 Demo — Closed-Loop Intelligence
CONSEQUENCE CLOSED.
From anomaly detection to resolved consequence chain in under 60 seconds. Walk through the full Synestra lifecycle — detect, trace, propose, authorize, close.
1
Detected
2
Traced
3
Proposed
4
Authorized
✓
Closed
Phase 01 — Anomaly Detection
Anomaly detected.
T+0:00 · PHX-A Campus · Hall B Row 4
Thermal Anomaly · Warning
CDU-B4 supply air temperature exceeding safe operating threshold
H100-B4 cluster GPU junction temp: 78→84°C and rising. Thermal throttle threshold is 87°C. At current rate, throttle fires in 9 seconds. Predicted throughput loss: 18%.
GPU throttle will reduce PDU-B4 draw by ~42 kW. That headroom cannot be reallocated while the thermal constraint is active — it becomes stranded capacity. Not a failure, but 42 kW of paid-for power is effectively offline.
Source: Power model · PDU-B4 headroom blocked · $1,260/hr at $0.03/kWh compute rate
Moves at-risk jobs to cooler cluster zone while thermal correction propagates. Prevents GPU throttle from firing. Jobs resume at full speed on target cluster within 30 seconds.
kW recovered
42 kW
Thermal normalized
~90s
Workload impact
None
EA score recovery
+1.6%
This proposal was generated automatically. No human identified this chain. Synestra traced 3 domains, identified the intervention, and estimated the outcome — all within 800ms of the triggering event arriving at the ingest API.
Phase 04 — Authorization
Manual or auto. Your call.
Manual Mode
Operator reviews and authorizes each intervention. Synestra proposes; humans decide. Recommended during Phase 1 onboarding.
Auto Mode
Synestra executes interventions automatically within pre-approved action boundaries. Phase 2 capability. Site-configurable per action type and severity.
Executes both recommended actions · logs to ServiceNow + PagerDuty · outcome tracked against 30-day baseline
✓
CONSEQUENCE CLOSED
PHX-A · Hall B Row 4 · chain cc_7q9rx · opened 14:22:11 · closed 14:22:58
Time to close
0:47
from detection to resolved
kW recovered
42 kW
headroom restored to PDU-B4
EA score
+1.6%
94.2% → 95.8%
GPU throttle
Avoided
H100-B4 cluster at full speed
Execution log
14:22:11DETECTCDU-B4 thermal anomaly received · source: Phaidra + BACnet