DataVox Installation Complete · Handoff to Synestra
Meridian Campus · Building 02
Day 1 · Synestra Rack Online · Connecting Domains
Rack Cost to Customer
$0
Synestra-funded MVP rack
Baseline Window
30 days
To EA gap quantification
Data Perimeter
On-Premises
No data leaves customer site
Gain-Share Model
20%
Of documented EA recovery
Power Domain
Live
UTD-12 feed · dual UPS · PDU strings
Transformer tap monitoring active
Transformer tap monitoring active
847 sensors · 12 feeds
Cooling Domain
Live
CRAC units · liquid cooling loops
Thermal margin across all zones
Thermal margin across all zones
312 sensors · 8 loops
Network Domain
Sensing
Fabric telemetry · optical health
BGP state · interface utilization
BGP state · interface utilization
1,204 links · 6 tiers
Compute Domain
Sensing
GPU cluster telemetry · job throughput
Checkpoint overhead · peer sync
Checkpoint overhead · peer sync
128 GPU nodes · 4 clusters
Deployment Sequence
Physical Installation
DataVox · Edge rack · cabling · patch · verify
Day 1 · 06:00
Domain Connections
Power + cooling live · network + compute sensing
Day 1 · 09:30
Baseline Accumulation
Multi-domain pattern library building · 30 days
Active now
EA Gap Quantification
Economic Availability baseline delta measured
Day 30
Performance Contract
Gain-share contract executed · 24-month minimum
Day 30–45
Starting pattern count
0
Synestra begins learning this facility from Day 1. Every sensor reading builds a picture the customer never had before.
30-day target
312+
Cross-domain patterns established. EA gap quantified. Performance contract ready to execute.
Baseline Accumulation · Meridian Campus · Building 02 · Days 1–30
Multi-domain learning in progress · Economic Availability gap emerging
Current day
1
of 30 · Baseline accumulation
0
Patterns identified
0
Cross-domain correlations
0
Consequence chains traced
0%
Baseline confidence
Pattern feed — live observations
Day 3Power draw oscillates +/-2.1% in 47-min cycle. Pattern #001
Day 7CRAC unit 4B cycles 18% more than peers. Thermal asymmetry confirmed. Pattern #039
Day 12Fabric link 3C attenuation correlates with CRAC cycle. Cross-domain #1
Day 16GPU cluster B2 checkpoint overhead: 14.8%. Predictable cadence. Pattern #127
Day 21EA gap visible: 6.2% throughput lost to thermal cycling. $2.1M/yr projected.
Day 26Power→Cooling→Network→Compute consequence chain: 0.8 sec trace. Chain #34
Day 30Baseline complete. 312 patterns · 91 chains · EA gap: $4.2M/yr. Contract ready.
Economic Availability Gap · Established
$4.2M/yr
Gap between potential economic output and delivered performance. Measured across all four domains. Gain-share baseline locked.
Performance Contract · Meridian Campus · Building 02 · Day 30
EA baseline established · 20% gain-share locked · 24-month minimum term
Measured EA Gap
$4.2M/yr
Baseline delta across power, cooling, network, compute. IPMVP-verified. Dispute-resistant.
Synestra Annual Earn
$840K/yr
20% of documented EA recovery. Scales with improvement. Customer keeps 80% of every dollar recovered.
Customer Upside
$3.4M/yr
80% of EA recovery flows to customer. Plus downstream GPU utilization gains not yet in baseline.
Contract Minimum
24 months
Phase 1 term. Phase 2 step-up at Month 24 when multi-site and autonomous optimization unlocks.
ACT V · Performance Agreement — Draft
SYN-CONTRACT-002 · Building 02
EA Baseline DateDay 30 · Locked
Baseline MethodIPMVP · 4-domain
Gain-Share Rate20% of documented recovery
Measurement CadenceMonthly verified report
Data ArchitectureOn-premises · no egress
Rack CapitalSynestra-funded · amortized
Phase 1 Term24 months minimum
Phase 2 TriggerMulti-site · autonomous loop
The first rack costs nothing. The baseline costs 30 days. The contract pays for years.
Zero friction. Maximum alignment.
$0 deployment cost30-day baseline20% gain-share performance contract